March 31, 2017

AWPR, Kingswells Junction

Caledonia Water Alliance
Archive
Header image

Installation of Rising Foul Mains 2no 280mm rising mains 1no 225 rising main

Scope of Work:

  • Installation of rising mains
  • Tie in to existing 200/ 250mm Ductile Iron Mains
  • Also, installation of 525 and 600mm dia concrete pipe gravity sewer and connected to existing 525mm sewer
Before
After